---
schema_version: '1.0'
id: government-20260821-52c5c4
title: Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2, Shearon
  Harris Nuclear Power Plant, Unit 1, H.B. Robinson Steam Electric Plant, Unit 2,
  H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation;
  Consideration of Approval of Transfer of Licenses and Conforming Amendments
content_kind: government-document
url: https://www.federalregister.gov/documents/2026/08/21/2026-17147/duke-energy-progress-llc-brunswick-steam-electric-plant-units-1-and-2-shearon-harris-nuclear-power
url_hash: 52c5c4acbe46c628c0f699638404b9bf4f718f43649c244d26ef0ae182572250
canonical_url: https://www.federalregister.gov/documents/2026/08/21/2026-17147/duke-energy-progress-llc-brunswick-steam-electric-plant-units-1-and-2-shearon-harris-nuclear-power
source: us-federal-register
category: government/us
category_raw: Notice
country: us
region: us
tags: []
lang: en
published_at: '2026-08-21T00:00:00Z'
fetched_at: '2026-08-21T15:01:45.823303Z'
updated_at: '2026-08-21T15:04:02Z'
status: published
content_hash: c5fab65198dfeae330e0f8934e3debcbf2ae3bfc8b7aab3c40026637e8d23c7a
content_changed_at: null
license_note: full
license_basis: public-domain-17usc105
body_available: false
attribution: 'Source: Office of the Federal Register, National Archives and Records
  Administration'
license_rule: source:us-federal-register
summary: The U.S. Nuclear Regulatory Commission (NRC, the Commission) received and
  is considering approval of an application filed by Duke Energy Progress, LLC (DEP)
  and Duke Energy Carolinas, LLC (DEC) on March 20, 2026. The application seeks NRC
  approval of the direct transfer of Renewed Facility Operating License Nos. DPR-71
  and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2, respectively; Renewed
  Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit
  1; Subsequent Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam
  Electric Plant, Unit 2; and Renewed Materials License No. SNM-2502 for the H.B.
  Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation,
  currently held by DEP, to DEC and issuance of conforming license amendments.
summary_source: official
summary_en: The U.S. Nuclear Regulatory Commission (NRC, the Commission) received
  and is considering approval of an application filed by Duke Energy Progress, LLC
  (DEP) and Duke Energy Carolinas, LLC (DEC) on March 20, 2026. The application seeks
  NRC approval of the direct transfer of Renewed Facility Operating License Nos. DPR-71
  and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2, respectively; Renewed
  Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit
  1; Subsequent Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam
  Electric Plant, Unit 2; and Renewed Materials License No. SNM-2502 for the H.B.
  Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation,
  currently held by DEP, to DEC and issuance of conforming license amendments.
summary_omitted_reason: null
redistribution: true
keywords_en:
- Amendments
- and
- Approval
- Brunswick
- Conforming
- Consideration
- Duke
- Duke and Duchess of Sussex
- Electric
- Electric Vehicles
- Energy
- Fuel
- H.B
- Harris
- Independent
- Installation
- Licenses
- LLC
- Nuclear
- Plant
- Plant, Vegetable
- Power
- Progress
- Progress Road
entities_en:
- name: Duke and Duchess of Sussex
  type: 組織
- name: Electric Vehicles
  type: artifact
- name: Plant, Vegetable
  type: UNKNOWN
- name: Progress Road
  type: location
- name: Skullcandy
  type: organization
- name: Steam
  type: 組織
- name: 'varishangout.net/notice/B9QwjKvK1mue8pq5p2cosplayer: kaya huang#fgo'
  type: location
topics_en:
- public policy
- United States government
numeric_facts: []
provenance:
  doc_id: 2026-17147
  doc_id_scheme: fr_docnum
  issuer:
  - Nuclear Regulatory Commission
  doc_type: Notice
  subtype: null
  action: Application for direct transfer of licenses; opportunity to comment, request
    a hearing, and petition for leave to intervene.
  significant: null
entities:
- name: 'varishangout.net/notice/B9QwjKvK1mue8pq5p2cosplayer: kaya huang#fgo'
  type: location
- name: Duke and Duchess of Sussex
  type: 組織
- name: Progress Road
  type: location
- name: Skullcandy
  type: organization
- name: Steam
  type: 組織
- name: Electric Vehicles
  type: artifact
- name: Plant, Vegetable
  type: UNKNOWN
key_facts: []
related: []
related_auto:
- name: 致命躯壳II
  type: content
  weight: 1.0
- name: ISS
  type: location
  weight: 1.0
computed_at: '2026-08-21T15:04:02Z'
---

# Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H.B. Robinson Steam Electric Plant, Unit 2, H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of Licenses and Conforming Amendments

## TL;DR
The U.S. Nuclear Regulatory Commission (NRC, the Commission) received and is considering approval of an application filed by Duke Energy Progress, LLC (DEP) and Duke Energy Carolinas, LLC (DEC) on March 20, 2026. The application seeks NRC approval of the direct transfer of Renewed Facility Operating License Nos. DPR-71 and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2, respectively; Renewed Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit 1; Subsequent Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit 2; and Renewed Materials License No. SNM-2502 for the H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation, currently held by DEP, to DEC and issuance of conforming license amendments.

## Key Points
- (なし)

## Details
(本文なし。リンク先参照)

## Source
元記事: [Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H.B. Robinson Steam Electric Plant, Unit 2, H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of Licenses and Conforming Amendments](https://www.federalregister.gov/documents/2026/08/21/2026-17147/duke-energy-progress-llc-brunswick-steam-electric-plant-units-1-and-2-shearon-harris-nuclear-power) — published 2026-08-21T00:00:00Z
