---
schema_version: '1.0'
id: government-20260721-b8bb75
content_kind: government-document
url: https://www.federalregister.gov/documents/2026/07/21/2026-14674/sunshine-act-meeting-open-commission-meeting-wednesday-july-22-2026
url_hash: b8bb75cff783ea2aa6f512ee00504ada43a3809ab5ae1e531d8c229187a013e5
canonical_url: https://www.federalregister.gov/documents/2026/07/21/2026-14674/sunshine-act-meeting-open-commission-meeting-wednesday-july-22-2026
source: us-federal-register
category: government/us
category_raw: Notice
country: us
region: us
tags: []
lang: en
published_at: '2026-07-21T00:00:00Z'
fetched_at: '2026-07-22T16:02:01.565244Z'
updated_at: '2026-07-22T16:14:35Z'
status: published
content_hash: 42c4e1f83b421ceaf35670e705ae341e69d0c5ba6697e85bb6c59a30641ac26d
content_changed_at: null
license_note: full
license_basis: public-domain-17usc105
body_available: false
attribution: 'Source: Office of the Federal Register, National Archives and Records
  Administration'
license_rule: source:us-federal-register
summary: 'To maintain U.S. spectrum leadership, create a robust spectrum pipeline,
  and fulfill Congress'' direction in the One Big Beautiful Bill Act, the Commission
  will consider a Report and Order, Order of Proposed Modification, and Order on Reconsideration
  that makes 160 megahertz of the Upper C-band available in the contiguous United
  States for flexible-use, next- generation terrestrial wireless services via a system
  of competitive bidding. The introduction of new wireless services may begin in December
  2030, following the first tranche of adjacent band radio altimeter retrofits to
  be required by FAA. Among other steps, the item also adopts measures designed to
  ensure successful co- existence with adjacent band radio altimeters, creates a transition
  process to fairly and expeditiously relocate incumbent satellite operations, establishes
  rebates to support the FAA''s radio altimeter retrofit requirements, and resolves
  various pending petitions for reconsideration related to the 2020 Report and Order
  and Order of Proposed Modification reconfiguring the Lower C-band. 2.....................
  SPACE................ TITLE: Space Modernization for the 21st Century (SB Docket
  No. 25-306). SUMMARY: The Commission will consider a Report and Order and Further
  Notice of Proposed Rulemaking that would overhaul the Commission''s rules for licensing
  space and earth stations to increase speed, predictability, and flexibility in order
  to support the American space economy. The Order would replace part 25 with a new
  rule part-- part 100--that would create a "licensing assembly line" to process applications.
  The FNPRM would seek comment on and propose additional changes which build upon
  the new part 100. 3..................... CONSUMER & TITLE: Empowering GOVERNMENTAL
  AFFAIRS. Broadband Consumers Through Transparency (CG Docket No. 22-2); Delete,
  Delete, Delete (GN Docket No. 25-133). SUMMARY: The Commission will consider a Report
  and Order that would modify the broadband label rules to make labels easier to read
  and understand and more useful for consumers, while reducing compliance burdens
  on providers. 4..................... WIRELINE COMPETITION. TITLE: Improving the
  Effectiveness of the Robocall Mitigation Database (WC Docket No. 24-213); Call Authentication
  Trust Anchor (WC Docket No. 17- 97); Advanced Methods to Target and Eliminate Unlawful
  Robocalls (CG Docket No. 17-59). SUMMARY: The Commission will consider a Further
  Notice of Proposed Rulemaking that aims to materially strengthen the integrity of
  the United States voice ecosystem and further deter illegal calls by proposing measures
  to ensure that only legitimate, transparent, and accountable providers gain or maintain
  access to the Robocall Mitigation Database. 5..................... OFFICE OF ENGINEERING
  TITLE: Strengthening & TECHNOLOGY. Rules Governing Dangerous Gear (ET Docket No.
  21-232). SUMMARY: The Commission will consider a Third Report and Order and Third
  Further Notice of Proposed Rulemaking aimed at further strengthening national security
  in the equipment authorization program by closing component-level and supply-chain
  loopholes in the Commission''s Covered List rules. The item would close the "component
  part loophole" by prohibiting authorization of devices that incorporate logic- bearing
  hardware components produced by Covered List entities; clarify that the marketing
  rules reach online marketplaces that list, distribute, or offer unauthorized equipment
  and require those marketplaces to display the FCC ID at the online point of sale;
  require full certification for any modification or permissive change made by a Covered
  List entity; and adopt a narrowed, statutorily- grounded definition of "critical
  infrastructure" in response to the D.C. Circuit''s partial remand. The accompanying
  Further Notice would seek comment on bifurcating the Covered List into producer/
  provider-based and production location- based categories, enhancing supply-chain
  transparency through hardware and software bills of materials, and strengthening
  enforcement. ------------------------------------------------------------------------'
summary_source: official
summary_en: 'To maintain U.S. spectrum leadership, create a robust spectrum pipeline,
  and fulfill Congress'' direction in the One Big Beautiful Bill Act, the Commission
  will consider a Report and Order, Order of Proposed Modification, and Order on Reconsideration
  that makes 160 megahertz of the Upper C-band available in the contiguous United
  States for flexible-use, next- generation terrestrial wireless services via a system
  of competitive bidding. The introduction of new wireless services may begin in December
  2030, following the first tranche of adjacent band radio altimeter retrofits to
  be required by FAA. Among other steps, the item also adopts measures designed to
  ensure successful co- existence with adjacent band radio altimeters, creates a transition
  process to fairly and expeditiously relocate incumbent satellite operations, establishes
  rebates to support the FAA''s radio altimeter retrofit requirements, and resolves
  various pending petitions for reconsideration related to the 2020 Report and Order
  and Order of Proposed Modification reconfiguring the Lower C-band. 2.....................
  SPACE................ TITLE: Space Modernization for the 21st Century (SB Docket
  No. 25-306). SUMMARY: The Commission will consider a Report and Order and Further
  Notice of Proposed Rulemaking that would overhaul the Commission''s rules for licensing
  space and earth stations to increase speed, predictability, and flexibility in order
  to support the American space economy. The Order would replace part 25 with a new
  rule part-- part 100--that would create a "licensing assembly line" to process applications.
  The FNPRM would seek comment on and propose additional changes which build upon
  the new part 100. 3..................... CONSUMER & TITLE: Empowering GOVERNMENTAL
  AFFAIRS. Broadband Consumers Through Transparency (CG Docket No. 22-2); Delete,
  Delete, Delete (GN Docket No. 25-133). SUMMARY: The Commission will consider a Report
  and Order that would modify the broadband label rules to make labels easier to read
  and understand and more useful for consumers, while reducing compliance burdens
  on providers. 4..................... WIRELINE COMPETITION. TITLE: Improving the
  Effectiveness of the Robocall Mitigation Database (WC Docket No. 24-213); Call Authentication
  Trust Anchor (WC Docket No. 17- 97); Advanced Methods to Target and Eliminate Unlawful
  Robocalls (CG Docket No. 17-59). SUMMARY: The Commission will consider a Further
  Notice of Proposed Rulemaking that aims to materially strengthen the integrity of
  the United States voice ecosystem and further deter illegal calls by proposing measures
  to ensure that only legitimate, transparent, and accountable providers gain or maintain
  access to the Robocall Mitigation Database. 5..................... OFFICE OF ENGINEERING
  TITLE: Strengthening & TECHNOLOGY. Rules Governing Dangerous Gear (ET Docket No.
  21-232). SUMMARY: The Commission will consider a Third Report and Order and Third
  Further Notice of Proposed Rulemaking aimed at further strengthening national security
  in the equipment authorization program by closing component-level and supply-chain
  loopholes in the Commission''s Covered List rules. The item would close the "component
  part loophole" by prohibiting authorization of devices that incorporate logic- bearing
  hardware components produced by Covered List entities; clarify that the marketing
  rules reach online marketplaces that list, distribute, or offer unauthorized equipment
  and require those marketplaces to display the FCC ID at the online point of sale;
  require full certification for any modification or permissive change made by a Covered
  List entity; and adopt a narrowed, statutorily- grounded definition of "critical
  infrastructure" in response to the D.C. Circuit''s partial remand. The accompanying
  Further Notice would seek comment on bifurcating the Covered List into producer/
  provider-based and production location- based categories, enhancing supply-chain
  transparency through hardware and software bills of materials, and strengthening
  enforcement. ------------------------------------------------------------------------'
provenance:
  doc_id: 2026-14674
  doc_id_scheme: fr_docnum
  issuer:
  - Federal Communications Commission
  doc_type: Notice
  subtype: null
  action: null
  significant: null
entities:
- name: ACT-2
  type: artifact
- name: meeting
  type: event
- name: OpenAI
  type: organization
- name: European Commission
  type: organization
- name: WyrdWednesday
  type: event
- name: July 19th, 2026 Morning
  type: event
key_facts: []
related: []
related_auto:
- name: Apple
  type: organization
  weight: 7.0
- name: Infinity
  type: organization
  weight: 2.0
- name: Hugging Face
  type: organization
  weight: 2.0
- name: Sunday Robotics
  type: organization
  weight: 1.0
- name: Anthropic
  type: organization
  weight: 1.0
title: Sunshine Act Meeting; Open Commission Meeting Wednesday, July 22, 2026
---

# Sunshine Act Meeting; Open Commission Meeting Wednesday, July 22, 2026

## TL;DR
To maintain U.S. spectrum leadership, create a robust spectrum pipeline, and fulfill Congress' direction in the One Big Beautiful Bill Act, the Commission will consider a Report and Order, Order of Proposed Modification, and Order on Reconsideration that makes 160 megahertz of the Upper C-band available in the contiguous United States for flexible-use, next- generation terrestrial wireless services via a system of competitive bidding. The introduction of new wireless services may begin in December 2030, following the first tranche of adjacent band radio altimeter retrofits to be required by FAA. Among other steps, the item also adopts measures designed to ensure successful co- existence with adjacent band radio altimeters, creates a transition process to fairly and expeditiously relocate incumbent satellite operations, establishes rebates to support the FAA's radio altimeter retrofit requirements, and resolves various pending petitions for reconsideration related to the 2020 Report and Order and Order of Proposed Modification reconfiguring the Lower C-band. 2..................... SPACE................ TITLE: Space Modernization for the 21st Century (SB Docket No. 25-306). SUMMARY: The Commission will consider a Report and Order and Further Notice of Proposed Rulemaking that would overhaul the Commission's rules for licensing space and earth stations to increase speed, predictability, and flexibility in order to support the American space economy. The Order would replace part 25 with a new rule part-- part 100--that would create a "licensing assembly line" to process applications. The FNPRM would seek comment on and propose additional changes which build upon the new part 100. 3..................... CONSUMER & TITLE: Empowering GOVERNMENTAL AFFAIRS. Broadband Consumers Through Transparency (CG Docket No. 22-2); Delete, Delete, Delete (GN Docket No. 25-133). SUMMARY: The Commission will consider a Report and Order that would modify the broadband label rules to make labels easier to read and understand and more useful for consumers, while reducing compliance burdens on providers. 4..................... WIRELINE COMPETITION. TITLE: Improving the Effectiveness of the Robocall Mitigation Database (WC Docket No. 24-213); Call Authentication Trust Anchor (WC Docket No. 17- 97); Advanced Methods to Target and Eliminate Unlawful Robocalls (CG Docket No. 17-59). SUMMARY: The Commission will consider a Further Notice of Proposed Rulemaking that aims to materially strengthen the integrity of the United States voice ecosystem and further deter illegal calls by proposing measures to ensure that only legitimate, transparent, and accountable providers gain or maintain access to the Robocall Mitigation Database. 5..................... OFFICE OF ENGINEERING TITLE: Strengthening & TECHNOLOGY. Rules Governing Dangerous Gear (ET Docket No. 21-232). SUMMARY: The Commission will consider a Third Report and Order and Third Further Notice of Proposed Rulemaking aimed at further strengthening national security in the equipment authorization program by closing component-level and supply-chain loopholes in the Commission's Covered List rules. The item would close the "component part loophole" by prohibiting authorization of devices that incorporate logic- bearing hardware components produced by Covered List entities; clarify that the marketing rules reach online marketplaces that list, distribute, or offer unauthorized equipment and require those marketplaces to display the FCC ID at the online point of sale; require full certification for any modification or permissive change made by a Covered List entity; and adopt a narrowed, statutorily- grounded definition of "critical infrastructure" in response to the D.C. Circuit's partial remand. The accompanying Further Notice would seek comment on bifurcating the Covered List into producer/ provider-based and production location- based categories, enhancing supply-chain transparency through hardware and software bills of materials, and strengthening enforcement. ------------------------------------------------------------------------

## Key Points
- (なし)

## Details
(本文なし。リンク先参照)

## Source
元記事: [Sunshine Act Meeting; Open Commission Meeting Wednesday, July 22, 2026](https://www.federalregister.gov/documents/2026/07/21/2026-14674/sunshine-act-meeting-open-commission-meeting-wednesday-july-22-2026) — published 2026-07-21T00:00:00Z
